Overhaul update
Another very productive day!

There is a certain amount of shuffling around in the works in connection to the forthcoming roof replacement, and 82045 is now positioned behind 2968. The opportunity was taken to couple the engines together so that 2968 could be moved to establish the exact position of the crosshead on the front and back quarters, necessary to allow valve setting.

The left hand running plate properly aligned. The hexagon headed bolts are being replaced in turn by dome headed equivalents, as this reduces the risk of tripping by men accessing the running plate.

The Fund’s working party also permanently fitted the right side cylinder cover. The new copper gasket, not an original fitting, is seen on the studs while the cover lies in the foreground. The cladding around the valve chest had to be compressed slightly to allow sufficient clearance, hence the G clamp.

Some of the items in course of Graham’s attention. The valve lower left is the shut off for the steam atomiser; lower right the valve supplying oil to the smokebox regulator; while top right are a couple of collars, part of the main steam pipes to the cylinders.

In the boiler shop, work on the foundation ring continues. Aligning the holes through corners is tricky.