Overhaul update

The chimney is in place although probably not finally depending upon work in progress inside the smokebox.

Inside the smokebox showing the bottom of the chimney with the exhaust ejector ring in place. The two brown pipes will be welded together using a suitable elbow followed by being connected to the exhaust ejector pipe that runs from the outside of the smokebox to the ejector itself which is just in front of the cab on the left hand side of the firebox.

The right hand cylinder snifting valve (the brass coloured item with the holes) was fitted by the paid staff. The left hand one was to follow later in the day.