Overhaul update

Parts of the spring, hanger and bracket are visible within the frames, as well as the pinned Horwich hornguide stretcher.

The four hanger brackets removed so far. Each is marked for its location. Those for the leading wheelset are rather inaccessible behind the cylinder back covers.

Then the new sections and dragbox all bolted into place to ensure accurate alignment as the new frame sections are welded into place.

The Fund’s working parties have begun refitting lubrication pipework and checking that all piping, unions and non-return valves are clear and working, and oil is arriving where it’s needed.

Inside the boiler shop. Much marking up of the backplate is in evidence preparatory to cutting off the bottom two-thirds or so.

The rear support bracket for the back of the firebox is shown here after removal from the frame stretcher. which in turn will be removed ready for replacement in the future.